Putting a window where there was not one is a different trade conversation than replacing a window where there was. You are not ordering a unit to fit a hole; you are making the hole, and the wall you want to cut may be holding something up. That means a header sized for the span and the load above it, bearing at both ends, and somebody who can tell you whether the wall is structural before a saw ever comes out of the truck.
Same story for an addition, a bump-out, a garage conversion, or a basement becoming living space. The window is the last decision rather than the first. We match Wasatch Front homeowners with contractors who work in that order, structure and permit and opening and then glass, because a window salesperson and a remodeler are asking very different questions when they stand in front of the same wall.
This is a framing and finish project with a window in the middle, so the window is rarely the largest line on it. What drives the number: whether the wall is load-bearing and what header the span requires; how large the opening is; what the exterior is made of, since cutting stucco, brick, or stone is a different day than cutting lap siding; what lives inside the wall, meaning wiring, plumbing, and ductwork that has to move; whether interior finish runs through paint or stops at drywall; and what your city requires for permit and inspection. Second-story openings add access on top of all of it.
Sometimes, and it is rarely as small a change as it sounds. Widening an opening means a longer span, a bigger header, and possibly new bearing at the ends. Going taller can run into the top plate. Both mean siding or masonry work outside and drywall and trim inside. Get the structural answer before you fall in love with the view.
Almost certainly, and you want one. Cutting a new opening changes structure, and the permit is what makes it a documented, inspected change instead of something you explain to a buyer's inspector later. Requirements vary by city across Salt Lake, Utah, Davis, and Weber counties, so the contractor should be pulling it, not you.
Not always, which is exactly why you ask. Plenty of window companies install into existing openings all day and never frame anything. A remodeler or general contractor handles structure, permit, and the repairs inside and out. We route new-opening projects to that second group so the first conversation is about the wall.
Longer than a replacement, with more moving parts. The window is measured and ordered once the opening exists or is fully designed, so lead time runs alongside framing rather than after it. Then siding, drywall, trim, and paint follow. Ask for a sequence instead of a single date, and ask what the wall looks like meanwhile.
Whole-house or a few tired openings. The real decision is insert versus full-frame, and it depends entirely on the condition of the frame you already have. We match you with crews who look before they promise.
Learn more →Sliders that drag, French doors that bind in August, entry doors showing daylight at the corner. Doors live or die on operation, threshold, and weather exposure, so we match on door experience specifically rather than window volume.
Learn more →A basement bedroom needs an opening a person can climb out of. Sometimes that is a larger unit in the existing hole; sometimes it means cutting concrete and setting a well. We route those to crews who do both.
Learn more →Takes a minute. Or call 801-644-9000 and skip the typing entirely.